Installations
 
Lignite Fines are discharged with a 
3.6 m BinEx.  Both Silo & BinEx are designed to 
withstand pressures up to 2 bar
4.0 m BinEx handling FGD Gypsum feeding a HAC 
(High Angle Conveyor) in a Wallboard 
 
 Three 3.0 m BinEx and a Chain Conveyor 
in a French Cement Plant
Wet Sludge is discharged with a 4.0 m 
BinEx with internal drive
 
4.0 m BinEx with internal drive being unloaded from it's barge. 
Used to discharge 900 t/h of coal.
  
 Limestone Plant Storage of FGD Gypsum

 

phone:
fax:
e-mail:

705-749-3544
705-740-1775
info@wtwamericas.com
130 Hunter Street West
Peterborough, ON Canada
K9H 2K8